Waste water treatment plant


Waste water treatment plant in Nhon trach 1 Industrial zone
Waste water treatment system
* Designed capacity: 4000m3/day and night
* Phase 1: the capacity of 2000m3/day and night, being completed and coming into operation from December 2005.
* Phase 2: being completed in June 2009.
- For capacity: increasing the capacity to 4000m3/day and night.
- For technology: Installing Colorkilling phase after biological treatment phase.
The total area of factory : 5hectares
+ The area for constructing waste water treatment system: 1,2 hectares
+ Natural biological lake: 2,8hectares
+ Roads, green and lawn: 1hectare
* The whole 4000m3/day and night has come into operation from June 2009. The volume of waste water running into the factory fluctuates from 2700 to 2800 m3/day and night.
* Receiving source: through Ba Ky channel into Thi Vai river
|